Passa al contenuto

Injection moulds and plastic parts made to order

We make a new injection mould from your drawing — or design it from your sample — mould the parts in volume at the factory in China and prepare the export. The mould belongs to you. First quote within 5 working days.

Request a quote All services in China

20+ years
of sourcing in China
5 working days
to your first quote
~30 days
typical production
Your tooling
dies and moulds belong to you

What we do

Injection moulds from your drawing

A new mould made to your part drawing.

Moulds designed from a sample

No drawing? We design the mould from your sample part.

Plastic injection moulding

Plastic parts moulded in volume.

Plastic profile extrusion

Plastic profiles to your drawing.

What to send for a quote

  • Part drawing (STEP, DWG, PDF) or a sample
  • Plastic and colour, if known
  • Order or annual quantity
  • Target price, if you have one

How it works

  1. Send your request — drawing, sample or photo, quantity and target price.
  2. Quote — first price within 5 working days; minimum order quantity stated in the quote.
  3. Tooling and samples — dies or moulds made for your part; paid samples before production.
  4. Production and quality control — we follow your order at the factory.
  5. Export and shipment — export documents prepared for your order.

Also made to order in China: Custom aluminium extrusion to your drawing, metal parts, rubber seals and product sourcing — China sourcing & custom manufacturing services.

FAQ

How much does an injection mould cost?

It depends on the part — its size and complexity. We give the mould price and the part price in the quote, within 5 working days.

Who owns the dies and moulds?

You do. Extrusion dies and injection moulds made for your order belong to you.

Can you make a mould from a sample?

Yes. Send us the sample part and we design the mould from it.

Can I get samples before ordering?

Yes. Samples are paid and come before production — cost and timing are stated in the quote.

What is the minimum order?

It depends on the product and the factory. We state the minimum order quantity in the first quote.

How long does production take?

Typical production time is about 30 days, depending on the product. The lead time is confirmed in the quote.

Request a quote

First quote within 5 working days.

Sourcing and manufacturing by KONSTOR — partner company of XTERIORA.